PRE/POST-COMMISSIONING SURVEYS


Pre-commissioning surveys are essential for a complete understanding of a project and are used for the pinpoint design of MEP systems.

Key Survey Inputs:

  • System Layout analysis.
  • Engineering Feasibility Study.
  • On-Site Asset Surveys.
  • As-Built Analysis.
  • Sustainability analysis (LEED, ESTIDAMA, etc.).